Some work...
/Busy times, a lot of different jobs getting done and a visitor from a far off land…
From Bali to the Vale.
Caleb touching up a door before it goes out to be fitted.
A front door we done for the West End, frosted glass, polished brass ironmongery and painted black, all excellent choices.
This one turned out well, really pleased with it. I keep saying that I’m really pleased with how everythings turned out. I think it’s my age, I think I’m just really pleased with stuff. I think it could be that I’m just tired and at a delusional state trying to get through the work. It’s good. Can’t complain.
This is a coffee table, It’s made from a load of different wood that I’ve been humphing about with me the past few years. Most of it was from storm damaged trees in Lochgoilhead, I’d always get something to use every winter. Will be finished soon.
Garvity boots, man!
Back to work, as always if you’ve found this and are looking for something the best way to get in touch is by email. The lead time isn’t crazy mental but it’s still about 4-6 months for your stuff, trying to bring it down but we’re having a hard time finding help. Everyone must be an influencer now or into crypto. I shoulda’ done that!
My brother Ross got me a set of chisels for my birthday, excellent. 42 man. Jesus!
Take it easy. Time’s flying by. I don’t like getting older!











